dsc_0062Circulation Services will begin operations in the Helm Reference Room tomorrow, Wednesday 9/26. Ceiling tiles are already disappearing from 4th floor Cravens. The renovation has begun. Most furniture has been removed.

Leisure Reading Books are in Helm 100; audio books are permanently located in VPAL, Cravens 2nd floor.

There will be limited access to the 4th floor lobby for the ATM but as construction progresses that entrance may not always be available. Please check our blog and website for updates.

The VPAL second floor entrance is accessible for that floor.

Access to Cravens 5-9 will be through Helm 2nd floor to Cravens 5th floor elevators. Some access will be available from Reference to 4th floor elevator unless flooring is involved.

Please check signs or ask! Thank you for your patience.

Patrons needing accommodation for mobility issues, please call 270-745-3951 for assistance.